Available immediately after respondent completion
- Risk rating + confidence
- Benchmark percentile
- Preliminary signals
The Snapshot is free because governance conversations need to start before the full diagnostic. Designed for forwarding.
Scales with program materiality. Talk to us for programs >$50m.
Delivered in 48 hours. Includes:
- Risk rating + confidence with disclosed basis
- Benchmark percentile vs matched peer cohort
- Alignment Index
- Top 5 risk drivers
- Benefits-at-risk
- 90-day action plan
- Conditions-to-proceed
- Escalation questions
- Governance Decision Memo
Strengthens the evidentiary basis through uploads-based artefact assessment with redaction, 14-day deletion of originals, and data residency options (AU, US, EU).
- Everything in Board Assurance Report
- Artefact-based evidence review
- Second-review sign-off
- Enterprise controls available
At 90 days. Confirms conditions met or escalates. Updated risk rating.
The natural second transaction after a Step-up recommendation.
Book a callControls scope, methodology, deliverable standards, and named-resourcing requirements โ issued to up to three panel members.
Gives the commissioning executive control over assurance quality under panel rules, regardless of which provider wins.
Book a callConsistent, comparable governance data across all material programs with portfolio heatmap, trend data, and watchlist.
The PMO or CIO presents this to the board as a governance product.
Book a call- The Board Assurance Report is a standardised stage-gate control diagnostic. It is not a financial audit, not full program assurance, and does not constitute a certification or guarantee of outcomes.
- ProjectPhD does not predict success or failure. It provides comparative cohort outcome rates paired with transparent confidence drivers and explicit cohort-size disclosure.
- Where full independent assurance is required, the Evidence Review strengthens the evidence base, and the Assurance Panel RFP Pack controls the scope and quality of full assurance under panel rules.
Questions before commissioning?